HIRE US

House pads cut, level and ready

A good slab starts on a flat, firm pad. We cut it, level it and spread the base course.

$800 a day with an operator, plus Hawaii GET. The trip from Keaau is free on jobs of 4 or more work days.

A leveled house pad covered in grey base course, stakes and string lines around it, the 306 at its edge
Illustration. Real job photos replace these as jobs finish.

What it is

We cut the pad to your stakes, break any lava humps with the hammer, level it, and spread base course so your builder starts on solid ground. The same work makes a flat catchment pad for a water tank.

When you need it

  • You have plans and stakes and need the pad ready for forms.
  • Your pad site is pahoehoe humps and ridges.
  • You need a level catchment pad for a water tank.
  • You want base course down before the concrete truck shows up.

The tool that does it

The 24 inch bucket cuts, the hammer takes down lava when the pad sits on rock, and the 36 inch grading bucket spreads the base course and finishes the pad flat.

INSTANT ESTIMATE

Price range in a minute

Instant estimate, firm quote after. We lock the number after a site visit.

More we do

Tell us about your land.

Price range in a minute. Real person on the phone after.

Hire us Rent the 306

Or call (808) 319-6399, Monday to Friday, 9 am to 5 pm, Hawaii time.